Folder North Yukon Consistency Opinions

The staff of the Yukon Land Use Planning Council (YLUPC) are providing consistency opinions in the absence of the North Yukon Planning Commission. More explanations can be found here and here. The results of these checks are below:

Documents

pdf 2022 0160: Hydrometric Cableway Station Decommissions

Tagged in cableway, conformity, consistency, decommision, infrastructure, North Yukon, opinion 43 downloads

Download (pdf, 267 KB)

NYRLUP_consistency_opinion_2022-0160.pdf

pdf Q2021-0229: Dempster Vanadium (Class 1) Popular

Tagged in checks, conformity, north, yukon 607 downloads

Download (pdf, 229 KB)

NYRLUP_Class_1_conformity_check_Q2021-0229.pdf

pdf Q2021-0159: KIEV Claims (Class 1) Popular

Tagged in checks, conformity, north, yukon 645 downloads

Download (pdf, 227 KB)

NYRLUP_Class_1_conformity_check_Q2021-0159.pdf

pdf Q2021-0154: WRM Project - MH Claims (Class 1) Popular

Tagged in checks, conformity, north, yukon 577 downloads

Download (pdf, 226 KB)

NYRLUP_Class_1_conformity_check_Q2021-0154.pdf

pdf Q2021-0152: WRM Project - SC Claims (Class 1) Popular

Tagged in checks, conformity, north, yukon 602 downloads

Download (pdf, 227 KB)

NYRLUP_Class_1_conformity_check_Q2021-0152.pdf

pdf 2020-0197: Eagle Plains Well Maintenance and Extended Flow Testing Popular

Tagged in checks, conformity, north, yukon 603 downloads

Download (pdf, 262 KB)

NYRLUP_conformity_check_2020-0197.pdf

pdf 2020-0153: VGFN Elder's Community Complex Popular

847 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2020-0153.pdf

pdf 2019-0140: Dempster Fibre Optics Project Popular

1098 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2019-0140.pdf

pdf 2019-0027: CBC Nature of Things - Porcupine Caribou Herd Popular

1139 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2019-0027.pdf

pdf 2018-0210: Power line to Old Crow Sewage Lagoon & Solid Waste Facility Popular

1598 downloads

Download (pdf, 187 KB)

NYRLUP_conformity_check_2018-0210.pdf

pdf 2018-0163: Classroom Salmon Incubation – Porcupine River Popular

1819 downloads

Download (pdf, 48 KB)

NYRLUP_conformity_check_2018-0163.pdf

pdf 2017-0137: Porcupine River Chum Salmon Restoration Project Popular

2055 downloads

Download (pdf, 288 KB)

NYRLUP_conformity_check_2017-0137.pdf

pdf 2017-0099: Culvert Replacement and Road Berming, KM 375 and KM 378 Dempster Highway Popular

2037 downloads

Download (pdf, 89 KB)

NYRLUP_conformity_check_2017-0099.pdf

pdf 2017-0033: Old Crow Wastewater Facility Popular

2076 downloads

Download (pdf, 417 KB)

NYRLUP_conformity_check_2017-0033.pdf

pdf 2016-0062: Old Crow Solar Project Popular

2563 downloads

Download (pdf, 325 KB)

NYRLUP_conformity_check_2016-0062.pdf

pdf Eagle Plains Case Study 2014 Popular

3109 downloads

Download (pdf, 2.44 MB)

EaglePlainsCaseStudy2014.pdf

This presentation was developed to show some of the assumptions made in determining conformity, as well as some of the questions that arose. This presentation was targeted towards an internal, technical audience. We hope to provide better public documentation over the next year.

pdf 2014-0112: Eagle Plains Multi-Well Exploration Program (December 8, 2015) Popular

5015 downloads

Download (pdf, 279 KB)

NYRLUP_conformity_checks_2014-0112_20151209.pdf

pdf 2015-0104: Sheep Creek Gravel Development Project (June 4, 2015) Popular

2774 downloads

Download (pdf, 144 KB)

NYRLUP_conformity_check_ 2015-0104.pdf

pdf 2015-0095: IBC Camp on US/CA Border (June 3, 2015) Popular

2707 downloads

Download (pdf, 127 KB)

NYRLUP_conformity_check_ 2015-0095.pdf

pdf 2014-0185: Solid Waste Disposal Facility – Eagle Plains (February 4, 2015) Popular

2922 downloads

Download (pdf, 111 KB)

NYRLUP_conformity_checks_ 2014-0185.pdf