Folder North Yukon Conformity Checks

The staff of the Yukon Land Use Planning Council (YLUPC) is doing the conformity checks on behalf of the North Yukon Planning Commission. More explanations can be found here and here. The results of these checks are below:

Documents

pdf LMU9 Surface Disturbance Pilot Study Report and Recommendations Popular

133 downloads

Download (pdf, 1.13 MB)

ny_lmu9_surface_disturbance_report_and_recommendations.pdf

ny lmu9 surface disturbance report and recommendations cover no draft smThis report describes the methods and results of a pilot study that mapped, evaluated and quantified human-caused disturbances in Land Management Unit (LMU) 9 “Eagle Plains” of the North Yukon Planning Region. It also provides recommendations for how the piloted methods of that study may be applied in other areas of the North Yukon Region and beyond and provides some options and estimated costs to do so.

pdf 2020-0153: VGFN Elder's Community Complex Popular

206 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2020-0153.pdf

pdf 2019-0140: Dempster Fibre Optics Project Popular

522 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2019-0140.pdf

pdf 2019-0027: CBC Nature of Things - Porcupine Caribou Herd Popular

521 downloads

Download (pdf, 236 KB)

NYRLUP_conformity_check_2019-0027.pdf

pdf 2018-0210: Power line to Old Crow Sewage Lagoon & Solid Waste Facility Popular

912 downloads

Download (pdf, 187 KB)

NYRLUP_conformity_check_2018-0210.pdf

pdf 2018-0163: Classroom Salmon Incubation – Porcupine River Popular

1085 downloads

Download (pdf, 48 KB)

NYRLUP_conformity_check_2018-0163.pdf

pdf 2017-0137: Porcupine River Chum Salmon Restoration Project Popular

1345 downloads

Download (pdf, 288 KB)

NYRLUP_conformity_check_2017-0137.pdf

pdf 2017-0099: Culvert Replacement and Road Berming, KM 375 and KM 378 Dempster Highway Popular

1465 downloads

Download (pdf, 89 KB)

NYRLUP_conformity_check_2017-0099.pdf

pdf 2017-0033: Old Crow Wastewater Facility Popular

1525 downloads

Download (pdf, 417 KB)

NYRLUP_conformity_check_2017-0033.pdf

pdf 2016-0062: Old Crow Solar Project Popular

1938 downloads

Download (pdf, 325 KB)

NYRLUP_conformity_check_2016-0062.pdf

pdf Eagle Plains Case Study 2014 Popular

2380 downloads

Download (pdf, 2.44 MB)

EaglePlainsCaseStudy2014.pdf

This presentation was developed to show some of the assumptions made in determining conformity, as well as some of the questions that arose. This presentation was targeted towards an internal, technical audience. We hope to provide better public documentation over the next year.

pdf 2014-0112: Eagle Plains Multi-Well Exploration Program (December 8, 2015) Popular

4435 downloads

Download (pdf, 279 KB)

NYRLUP_conformity_checks_2014-0112_20151209.pdf

pdf 2015-0104: Sheep Creek Gravel Development Project (June 4, 2015) Popular

2222 downloads

Download (pdf, 144 KB)

NYRLUP_conformity_check_ 2015-0104.pdf

pdf 2015-0095: IBC Camp on US/CA Border (June 3, 2015) Popular

2153 downloads

Download (pdf, 127 KB)

NYRLUP_conformity_check_ 2015-0095.pdf

pdf 2014-0185: Solid Waste Disposal Facility – Eagle Plains (February 4, 2015) Popular

2368 downloads

Download (pdf, 111 KB)

NYRLUP_conformity_checks_ 2014-0185.pdf

pdf 2015-0002: Dempster Highway Erosion Protection – Cornwall Creek and Rock River (January 14, 2015) Popular

2272 downloads

Download (pdf, 125 KB)

NYRLUP_conformity_check_ 2015-0002.pdf

pdf 2014-0175: Solid Waste Disposal Facility (SWDF) – Old Crow (December 19, 2014) Popular

2327 downloads

Download (pdf, 110 KB)

NYRLUP_conformity_checks_ 2014_0175.pdf

pdf 2014-0168: The Great Race – Caribou (December 18, 2014) Popular

2417 downloads

Download (pdf, 270 KB)

NYRLUP_conformity_checks_ 2014-0168.pdf

pdf 2014-0112: Eagle Plains Multi-Well Exploration Program (December 4, 2014) Popular

2404 downloads

Download (pdf, 260 KB)

NYRLUP_conformity checks_2014-0112.pdf

pdf 2013-0067 Presentation: Eagle Plains 3D Seismic Survey Popular

2915 downloads

Download (pdf, 3.02 MB)

Pptpresentation.pdf