Description
Type: Amendment
LMUs affected: 2A, 3, 4A
Date of Amendment: ~2010
Trigger: Implementation of the Plan
Key element of Plan: Recommendation in section 4.4
The recommendation in section 4.4 of the Plans states:

Should the applicable authorities decide to lift the North Yukon Land Withdrawal at a future date, LMU 2A (Old Crow – Rampart House, LMU 3 (Driftwood River), and LMU 4A (Bell – Waters River) should be considered for Integrated Management Area Zone II designation

In 2010, the Parties agreed to make these changes in concert with a consultation plan.

Specific changes to the plan:

Section Page(s) Details Status
2.1 2-1 Last paragraph of p. 2-1 should be updated to give current status and recent history. Unchanged
2.1 2-2 Figure 2.1 should be updated OR removed, with references to Map 1 of the Appendix 1 Unchanged
4.4 4-5,6 Text should be updated to give current status and recent history. Unchanged
4.4 4-6 Recommendation box should be removed OR changed to IMPLEMENTED box (or similar). Unchanged
Appendix 1 Map 1 Withdrawal overlay should be removed from affected LMUs. Changed only on stand-alone map and online

Before

After

Left: map in the original approved plan. Right: map after amendment (stars added here for clarity). Note the removal of the green hatching which indicated a land withdrawal.