← Back to Peel Watershed Change Registry

Yukon has put a combination of interim and indeterminate mineral (and oil & gas) withdrawals in place.


Change Information

Registry ID PW-2020-01
Region Peel Watershed
Category Implementation
Status Implemented
Effective Date 19 March 2020
Affected LMUs

Interim withdrawn to 2030:
LMU 1
LMU 4
LMU 6
LMU 10
LMU 15
LMU 16

SMA's with permanent withdrawals:
LMU 2
LMU 8
LMU 9
LMU 11
LMU 12
LMU 14

Affected Plan Sections 3.1 - Table 3.1
Related Documents

Peel Watershed Approved Plan
Mineral Withdrawals – OIC 2020-54
Oil and Gas Disposition Withdrawal – MO 2020-09


Based on the approved land designations, Yukon has put a combination of interim and indeterminate mineral (and oil & gas) withdrawals in place. For Wilderness Areas, there are 10-year interim withdrawals (2020 to 2030). For Special Management Areas, withdrawals do not have an expiry date.

The intent of the 10-year term of the interim withdrawals is to review these as part of a 10-year plan review. The plan states: “Withdrawal status reviewed as part of formal, longer-term public Plan review conducted jointly by the Parties.” (p. 35)


Specific Plan Adjustments

Section 3.1 - Table 3.1

Page(s): 35

Details:

No amendments are required to the plan as a result of the implementation of these withdrawals.

Document Status: Unchanged

Notes: