Lifting of North Yukon Withdrawal
Type:
LMUs affected:
Date of Amendment:
Trigger:
Key element of Plan:
Description
Amendment
2A, 3, 4A
~2010
Implementation of the Plan
Recommendation in section 4.4
The recommendation in section 4.4 of the Plans states:
Should the applicable authorities decide to lift the North
Yukon Land Withdrawal at a future date, LMU 2A (Old Crow
– Rampart House, LMU 3 (Driftwood River), and LMU 4A
(Bell – Waters River) should be considered for Integrated
Management Area Zone II designation
In 2010, the Parties agreed to make these changes in concert with a consultation plan.
Specific changes to plan
Section
2.1
2.1
4.4
4.4
Appendix 1
Page(s)
2-1
2-2
4-5,6
4-6
Map 1
Details
Last paragraph of p. 2-1 should be updated to give current status and recent history.
Figure 2.1 should be updated OR removed, with references to Map 1 of the Appendix 1
Text should be updated to give current status and recent history.
Recommendation box should be removed OR changed to IMPLEMENTED box (or similar).
Withdrawl overlay should be removed from affected LMUs.
Status
Unchanged
Unchanged
Unchanged
Unchanged
Changed only on stand-alone map and online
Before:
After:
Left: map in the original approved plan. Right: map after ammendment (stars added here for clarity). Note the removal of the green hatching indicatin a land withdrawal.